亚洲欧美丝袜精品久久中文字幕|成人社区无码操日本熟女|国内一区激情在线观看|国产无码A∨片成人有码|亚洲一本精品在线|清纯唯美亚洲综合|韩国人妻黄片国产在线久|国产黄色激情av在线干|日本黄色电影黄色电影|网站国产操逼一区二区

Construction method of corrugated asphalt flashing

Release time:2023-04-07 source:Dovoro

Base inspection shall be carried out to make sure that strength and flatness meet the requirements of construction specifications

 

Lay insulation boards on concrete roofs (depending on design and location)

 

Lay Dovoro corrugated flashing, with a longitudinal overlap of no less than 100mm and a transverse overlap of 1-2 waves

 

Place battens with spacing according to the requirements of roof tiles 

 

Use an impact drill to drill holes and penetrate the batten, Dovoro corrugated flashing, and insulation board

 

Use Dovoro special nails to fix the batten, flashing, and insulation board onto the base concrete

 

Install cornice grates at the eaves to ensure ventilation and prevent birds from entering the space under the tiles

 

Lay and fix roof tiles (according to manufacturer's requirements)

 

Become a distributor

A professional and complete team provides comprehensive service support covering from scheme design, architectural design optimization, construction scheme guidance, cost estimation, warehousing and transportation, various accessories to pre-sales, during sales, and after-sales.

Become a distributor now